|
|
| 3.
When the soil and
dispersing solution
are thoroughly mixed,
set the beaker aside
in a safe place and
allow it to sit for
roughly 24 hours (for
this step, the soil/dispersing
solution mixture can
sit over the weekend
until the next class). |
|

|
| 4.
Measure the distance
between the 500 mL
mark and the base
of the cylinder. (You
can place the measuring
stick inside the cylinder
to get this measurement.).
|
|

|
| 5.
Read the temperature
at which your hydrometer
has been calibrated
(such as 15.6°
C [60° F] or 20°
C) which is found
on the body of the
hydrometer.
|
|

|
Record
both the distance and the temperature
on the Particle-Size Distribution
Data Work Sheet.

|