|
|
| 10.
Gently set the
cylinder down
in a safe place,
and immediately
begin timing with
a stop watch or
clock with a second
hand. |
|

(Sample
starting time)
|
| 11.
After 1 minute,
carefully lower
the hydrometer
into the cylinder
so it floats in
the suspension.
Steady the hydrometer
to keep it from
bobbing up and
down. |
|

|
| 12.
At exactly 2
minutes
after the cylinder
was set down,
read the line
on the hydrometer
that is closest
to the surface
of the soil suspension
and record your
result on the
Particle-Size
Distribution Data
Work Sheet.
|
|


|
| 13.
Remove the hydrometer,
rinse it, dry
it, and gently
put it down in
a safe place.
|
|
|

|